IntelliLogistics
IntelliCore · freight cost engine

Every overcharged line on a freight invoice, priced again

Paste the waybill weight and box dimensions, your contracted rate card and the actual invoice. We recompute volumetric and chargeable weight, test every surcharge, island fee, return and storage charge against the contract, and price each overcharge line. Damage, loss and delay are settled against the parcel standard terms with a ready-to-send dispute letter and claim form.

Free without signup · nothing stored · not legal advice

Dimensions in cm, weight in kg. Volumetric divisor defaults to 6,000 cm³/kg; override with 부피계수=.

Your text is not stored; results show only on screen.

₩500k
parcel liability cap when the waybill states no value
Parcel standard terms Art. 22(3)
14 days
window to notify damage — miss it and liability can lapse
Art. 25(1)
200%
delay cap: excess days × freight × 50%, up to 200% of freight
Art. 22(2)3

How it works

We do not trust the invoice figures; we rebuild them from dimensions, weight and rates. Same input, same number.

1

Enter the waybill and invoice

Weight, box size and count, contract rate and surcharge, invoiced freight, weight and extras.

2

Rebuild chargeable weight and fair freight

Volumetric = L×W×H×boxes ÷ 6,000; chargeable = max(actual, volumetric); surcharges applied.

3

Take the difference and the letters

Per-line overcharge, claim amount by incident type, dispute letter, claim form, evidence list.

What it checks

Freight cost leaks in the arithmetic more often than in the rate.

Volumetric weight

L×W×H×boxes ÷ 6,000 against actual weight; any billed weight above it is a recoverable difference.

standard terms

Surcharge and island fees

Contract surcharge versus billed surcharge, and island fees on mainland addresses.

rate card

Return and storage charges

Whether the contract allows them and whether the cause was notified in writing.

Art. 8(4)

Damage and loss

Value stated on the waybill or the ₩500,000 cap; repair cost where repairable.

Art. 22

Delay

Excess days × freight × 50%, capped at 200% of freight.

Art. 22(2)3

3PL contract risk

Fuel index clauses, minimum volume, liability caps and rate-change notice periods.

Commercial Act 135

Pricing

The check is free. Subscriptions run 31 days from the payment day.

무료 검증

0원

오청구 총액과 상위 4개 항목의 계산 근거까지 확인합니다.

  • 청구서 1건 검증
  • 오청구 총액
  • 상위 4개 항목 상세
  • 원문 저장 없음
Start free

단건 정밀검증

₩29,000 / 31일

청구 1건 전체 항목 · 배상 청구액 · 이의제기서 초안

  • 항목별 오청구 전부
  • 배상액 계산
  • 이의제기서·청구서 초안
  • PDF 리포트
  • 31일 보관
Pay by card

물류비 정기감사

₩99,000 / 31일

월 200건 일괄 · 3PL 계약 조항 점검 · 월간 절감 리포트

  • 월 200건 일괄 검증
  • 3PL 계약 조항 점검
  • 거래처별 오청구 추세
  • 대리인 공유 링크
  • 우선 지원
Pay by card

Outside Korea — card via Payhip

Same engine, English report.

Team / agency

Multiple sites, API, white-label reports.

Questions

Where does the 6,000 divisor come from?

It is the standard volumetric divisor Korean parcel carriers use. If your contract states another divisor, enter 부피계수= and it takes precedence.

How do you decide an invoice is wrong?

By rebuilding fair freight from your rate card and the real weight and dimensions. Items absent from the contract, island fees on mainland addresses and billed weight above chargeable weight all need justification.

Is compensation three times the freight?

No. The standard terms pay the value stated on the waybill (or repair cost), or up to ₩500,000 when no value is stated. Delay pays excess days × freight × 50%, capped at 200%.

What if the carrier refuses?

Notify damage in writing within 14 days of receipt; later notice can extinguish the claim. Keep photos, video and repair quotes, then consider a formal demand or consumer dispute mediation.

IntelliLogistics compares the waybill, contract and invoice you enter against published parcel standard terms and the Commercial Act to estimate amounts. Actual settlement is decided by the carrier terms, the contract and dispute resolution. Not legal advice.